BlueNord ASA: BlueNord: Preliminary Production for February 2025
Oslo, 6 March 2025: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for February 2025. In February, the preliminary production was 35.5 mboepd net to BlueNord. The base assets, Dan, Gorm and Halfdan produced 20.4 mboepd and 15.1 mboepd was produced from the Tyra hub.
While the production from the base assets were lower than in previous months, it was in line with expectations due to planned maintenance work on Gorm during the period. The work was successfully completed, and Gorm production has resumed. Halfdan production was particularly strong, with a preliminary operational efficiency of 94%.
The Tyra ramp-up continued during February, and as announced on 28 February, a gas export rate above 200 mmscfpd was achieved. Ramp-up and fine tuning of the operations is still ongoing, and short-term shutdowns were experienced during the month.
This information is subject to disclosure requirements pursuant to section 5-12 of the Norwegian Securities Trading Act.
***
Contact:
Cathrine Torgersen, Chief Corporate Affairs Officer
Phone: +47 915 28 501
Email: cathrine.torgersen@bluenord.com